Question: About GOLSHAN gas field.

Answer: GOLSHAN is one of Iran’s Gas fields located in 180 km southeast of Bushehr and 65 kilometers off the coast of the Persian Gulf. The volume of gas stored in this field is between 42 and 56 trillion cubic feet.

On December 26, 2007 a contract between National Iranian Gas Company and Malaysia’s SKS Group Industrial was signed for development of gas extracting from this field and FERDOSI gas field worth $ 16 billion.  Also on 2009 a contract with BGP China for three-dimensional seismic project was signed. The purpose of this contract included drilling of 22 wells as well as installation of two 32 Inches submarine pipeline for transferring gas to onshore, construction of a refinery on shore with facilities of separating hydrocarbon liquids, gas condensate stabilization, LPG xportation.

پرسش: میدان گازی گلشن چه مشخصاتی دارد؟

پاسخ: میدان گلشن یکی از میدان‌های گازی ایران است که در ۱۸۰ کیلومتری جنوب شرقی بوشهر و ۶۵ کیلومتری ساحل خلیج فارسقرار دارد. حجم گاز موجود در مخزن این میدان بین ۴۲ تا ۵۶ هزار میلیارد فوت مکعب است.

در ۵ دی ۱۳۸۶ (۲۶ دسامبر ۲۰۰۷) قراردادی بین شرکت ملی گاز ایران و گروه صنعتی SKS مالزی جهت توسعه برداشت گاز از این میدان و میدان گازی فردوسی به ارزش ۱۶ میلیارد دلار منعقد شد. همچنین در سال ۱۳۸۸ قراردادی با شرکت BGP چینجهت پروژه لرزه‌نگاری سه بعدی این میدان و میدان فردوس انجام شد.از اهداف برنامه‌ریزی شده برای این قرارداد می‌توان به حفاری ۲۲ حلقه چاه، نصب دو سکوی تولید گاز در دریا، نصب دو خط لوله ۳۲ اینچه زیر دریایی انتقال گاز به خشکی، احداث یک پالایشگاه در ساحل به همراه تاسیسات مربوط به جداسازی مایعاتهیدروکربنی، تثبیت میعانات گازی، صادرات ال‌پی‌جی، ساخت گوی شناور و اسکله صادرات ال‌ان‌جی و … اشاره کرد.

 

 

Question: What are the Purposes of development Project of Bandkarkhe Field?

Answer: Identifying and describing the field, studying about reservoir and preparation field development plan by using three-dimensional seismic data and drilling two new rings and repair and completing available wells in order to produce an average of 7500 oil crude barrels per day and production of 40 thousand barrels of crude oil per day after complete development of oil field.

 

پرسش:اهداف طرحمیدان نفتی بندکرخه چیست؟

پاسخ:شناخت و توصیف میدان، انجام مطالعه مخزن و تهیه طرح توسعه میدان با استفاده از اطلاعات لرزه نگاری سه بعدی و حفاری ۲ حلقه توصیفی جدید و تعمیر و تکمیل چاه موجود به منظور تولید زود هنگام ۷۵۰۰ بشکه نفت خام در روز و در نهایت تولید ۴۰ هزار بشکه نفت خام در روز پس از توسعه کامل میدان.

 

 